What does FFL mean in construction?

Other information regarding levels are the natural ground line (NGL) and the finished floor level (FFL). The difference between the FFL and the TBM shows the builder how much higher or lower the house is from the TBM. For example if you have a TBM of 100.00 and a FFL of 100.3.

Simply so, How is an FFL calculated? Locate the structural floor height specified in the flooring project plans. Add the combined height of the architectural floor material, substrates and adhesives to the structural floor height. This is the finished floor level.

What is SSL in drawings? SSL – Structural Slab Level – the level at the top of the concrete slab.

Subsequently, Is DPC finished floor level?

Unlike timber suspended floors where the damp proof course will be sited below floor level with solid constructed floors the DPC should always be sited above finished floor level and should be visible.

What is the difference between FFL and SSL?

Correct me if Iam wrong, FFL refers to the level at the top surface of floor finish. This is where all the building element finish levels are referenced from. SFL refers to the level at the top surface of the floor screeding or concrete topping. While SSL refers to the level at the top surface of the structural slab.

What does CFL stand for in construction? CD: Construction Documents. CFL: Compact Fluorescent Lamp.

What is FFL Autocad?

Finished floor level (FFL) refers to the uppermost surface of a floor once construction has been completed but before any finishes have been applied.

What does WP mean in structural drawings? Structural Abbreviations

ASD Allowable Stress Design
VOF Vertical Outside Face
WWF Welded Wire Fabric
W/ With
WP Working Point

• Jan 16, 2020

What is GL in engineering drawing?

GL. ground line or ground level. GP. ground plane.

What does CPA stand for in construction? What Is a Construction CPA? At the basic level, a construction-specific CPA is a certified public accountant with an experienced understanding of how construction businesses operate and handle job costing.

What is a CRF in construction?

CRF – Change Request Form. CRI – Colour Rendering Index. CRISP – Construction Research and Innovation Strategy Panel (now the National Platform for the Built Environment) CRM – Conservation, Repair & Maintenance.

What is CRT in construction? As with any project, construction projects come with potential financial and operational risks for contractors when working with third-party providers of products and services. A Contractual Risk Transfer (CRT) program can help mitigate some of those risks.

What is FFL in floor plan?

A finished floor level survey measures where the height of the floor will be in a new building.

What is finished floor height?

The finished floor elevation (FFE) is the height at which the concrete slab for the 1st floor living area of the home needs to be at based on Florida Emergency Management Agency (FEMA) and specific land development code requirements.

What is finished level? Finished levels mean liveable levels, which to be specific are floors of a building that are developed with walls (specifically studs, insulation and drywall), separate rooms (if necessary), adequate ceiling height, electricity, flooring, and are heated areas for all four seasons.

What is a WP contractor?

WP Contractors matches pre-screened WordPress talent with the needs of your business.

What is BM in civil engineering?

B.M – Bending moment.

What is PL steel? Plate. Nomenclature: PL 0.5×12″x30″ Very small plates can also be called bars.

What is HT and VT in engineering drawing?

• Horizontal Trace (HT) The real or imaginary line of intersection of a plane. with the HP is called horizontal trace of the plane. HT is always located in the TV. • Vertical Trace (VT) The real or imaginary line of intersection of a plane with. the VP is called vertical trace of the plane.

What is HP VP and PP in engineering drawing? Position 1: Parallel to two planes & perpendicular to the other In 3D In 2D Parallel to H.P. Front View – Parallel line to reference line Parallel to V.P. Top View – Parallel Line to reference line Perpendicular to P.P. Side View – Point on the side of front view V.P. a’ Fv b’ X Y a b H.P. TV Y a” P.P. .

What is GL and IL?

Manhole rings and cover slabs to suit are manufactured in various depths and diameters to facilitate the range of pipe diameters and actual depth on site from ground level (GL) to invert level (IL).

What does cat stand for construction? Caterpillar Inc. (often shortened to CAT) is an American Fortune 100 corporation that designs, develops, engineers, manufactures, markets, and sells machinery, engines, financial products, and insurance to customers via a worldwide dealer network. It is the world’s largest construction-equipment manufacturer.

What is MH in construction?

L.V.L.: Laminated Veneer Lumber. MH: Manhole. Mas.: Masonry.

What does CCP stand for in construction? CCP-Certified Construction Professional Designation.

What is CRT role?

The function of the cathode-ray tube is to convert an electrical signal into a visual display. The tube contains an electron-gun structure (to provide a narrow beam of electrons) and a phosphor screen.

What is CRT in EMI? It is a type of vacuum tube which displays images when the electron beam through electron guns are strikes on the phosphorescent surface. …

How many types of CRT are there? There are two main types of CRT displays used in computer graphics. The first type, random-scan displays, is used primarily to draw sequences of line segments. The second type of CRT display is the raster-scan display. Raster-scan displays represent the screen as a logical collection of blocks known as pixels.

Don’t forget to share this post !

Leave A Reply

Your email address will not be published.