What is GL in engineering drawing?
GL. ground line or ground level. GP. ground plane.
What does DN mean in architecture? Architectural Abbreviations
# | Pound OR Number |
---|---|
DIMS | Dimensions |
DN | Down |
DR | Door |
DWG | Drawing |
• Aug 17, 2020
Similarly, What is HT and VT in engineering drawing? • Horizontal Trace (HT) The real or imaginary line of intersection of a plane. with the HP is called horizontal trace of the plane. HT is always located in the TV. • Vertical Trace (VT) The real or imaginary line of intersection of a plane with. the VP is called vertical trace of the plane.
What is FGL and NGL?
The confusion is that the level which we generally see is FGL(finished ground level) then to know NGL do we need to dig out the soil and check the hard stratum. Also is the use of columns in foundation dependent on this NGL.
What is NTS in architecture?
NTS – Not To Scale. Anything drawn with a “NTS” next to it means that whatever you do, you should not get a physical scale out to measure anything.
What does TOC mean in construction?
T.O.C.: Top of Curb or Top of Concrete.
What does CC mean construction? c. – circa. C/C – Centre to Centre.
What does WP mean in structural drawings? Structural Abbreviations
ASD | Allowable Stress Design |
---|---|
VOF | Vertical Outside Face |
WWF | Welded Wire Fabric |
W/ | With |
WP | Working Point |
• Jan 16, 2020
What is HP and VP?
Following abbreviations, symbols and notation will be used in the entire course. VP. – Vertical plane. HP. – Horizontal plane.
What is end projector distance? The distance between end projectors of line AB is 60 mm. The end A is 25 mm above HP and 45 mm in front of the VP, while the other end B is 60 mm above HP and 15 mm in front of the VP.
What is vertical trace?
A trace on the ground motion record representing the component of motion in a vertical plane and in the direction of the seismic wave travel direction.
What is NGL and OGL? What is difference between OGL & NGL? Ans:The first level taken of the natural ground without using any mechanical means is called NGL whereas the level taken after preparation of bed by using mechanical means Grader ,Doze, JCB & Roller is called OGL.
What is the height of sill level?
The height between the base of the window and floor level is known as sill height. In general, to ensure privacy, the sill height in bathrooms and bedrooms is kept equal to or greater than 1100 mm(3.5 feet) from the floor level.
What is sill level?
Sill level or Window Sill level:-
The level between the base portion of the window and portion of the floor above ground level (upwards) is called Sill level. Mortar bed or concrete bed is laid at the base of the window.
What AFF mean? Affirmative. Another common definition of AFF is « affirmative. » Originally a term used in radio conversations to mean « yes, » AFF is now widely used in text-based communications to indicate agreement or consent.
What is an SK in architecture?
SK sheets are the official format for issuing corrections, clarifications, changes, and other additional information after the construction set is issued. SKs become part of the construction documents, and should created and maintained with the same care as the big sheets.
What is WC in architecture?
Approved Document G (Sanitation, hot water safety and water efficiency), defines a water-closet (WC) as: ‘…a closet that has a separate receptacle connected to a drainage system and separate provision for flushing from a supply of clean water either by the operation of a mechanism or by automatic action. ‘
What is DLP construction? The so-called defect liability period (DLP) has started — it is a set period of time after the construction of the project has been completed, during which the contractor has the right and must return to the site to remedy any defects.
What is FFL civil?
1. SSL, FFL, SFL ABBREVIATIONS. • FINISH FLOOR LEVELFFL • STRUCTURAL FLOOR LEVELSFL • STRUCTURAL SLAB LEVELSSL. SSL-10900 ON STRUCTURAL DRAWING FFL-10600 SFL-10650 ON ARCHITECTURAL DRAWING ROOMS USUALLY NEEDS FILL UP CONCRETE FFL-10750 SFL-10900 ON ARCHITECTURAL DRAWING IN PARKING AREA USUALLY SFL=SSL.
What is full TLC? If someone or something needs some TLC, they need to be treated in a kind and caring way. TLC is an abbreviation for ‘tender loving care. ‘ [informal]
What is COP in architecture?
The COP architecture is essentially constituted by the following functional blocks … Context 2. … following functional blocks constitute the processing part: a processor interface (PCI interface), a command controller, a processing controller, a processing unit, a SRAM.
What is EW in rebar? For example, a notation of #4 at 12″ O.C., T&B, EW refers to the use of Number 4 rebar, spaced 12″ on center, on both the top and bottom faces, and oriented in both the longitudinal and transverse directions.
What is TOF in construction?
Top of Footing (construction) TOF.
What does FB mean in drawing? FB – Footing Beam. FB – From Below. FBC – Full Business Case. FBT – Farm business tenancy. FBTA – From Below To Above.